Jump to content

Transdev Auckland

From Wikipedia, the free encyclopedia

Transdev Auckland
Image
Overview
OwnerTransdev Australasia
LocaleAuckland, New Zealand
Transit typeSuburban rail
Number of lines
4
Number of stations
43
Daily ridership
93,000[1]
Annual ridership
21.4 million (July 2019)[2]
HeadquartersAuckland
Operation
Began operation
2004
Ended operation
15 January 2022
Number of vehicles
65 train sets
Technical
System length120 km (75 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification25 kV AC (Swanson to Papakura)

Transdev Auckland, formerly Veolia Transport Auckland, and Connex Auckland was a subsidiary of Transdev Australasia that ran Auckland's urban passenger trains under contract from Auckland Transport on infrastructure owned and managed by KiwiRail. Auckland Transport receives funding to subsidise these services from the NZ Transport Agency, which receives funding from road user taxes and Crown appropriations, and from the Auckland Council through rates.

Transdev also operates Wellington's commuter rail services as Transdev Wellington since July 2016.[3]

History

[edit]

The previous operator of the train network in Auckland was Tranz Metro. When the Auckland Regional Council called for tenders for the new contract, Tranz Metro did not tender and Connex (later Transdev) won the tender. Transdev in a consortium with John Holland and CAF was shortlisted to bid for the next contract in 2021, but lost out to Auckland One Rail. Transdev Auckland ceased on 15 January 2022.[4][5][6]

Network

[edit]
Auckland suburban
rail network
Image
 Swanson 
Image
Rānui
Image
Sturges Road
Image
Henderson
Image
Sunnyvale
Image
Glen Eden
Image
Fruitvale Road
Image
New Lynn
Image
Avondale
Image
Mount Albert
Image
Baldwin Avenue
Image
Morningside
Image
Kingsland
Image
Maungawhau
Image
Image
Image
Image
Image
Image
Image
Image
Image
Karanga-a-Hape
Grafton
Image
Image
Te Waihorotiu
Image
Image
 Waitematā 
Newmarket
Junction
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Parnell
Newmarket
Image
Image
Ōrākei
Remuera
Image
Image
Meadowbank
Greenlane
Image
Image
Glen Innes
Ellerslie
Image
Image
Panmure
Image
Image
Image
Image
Sylvia Park
Penrose
Image
Image
Image
Image
Image
Te Papapa
Image
Image
Image
Image
Image
Image
 Onehunga 
Image
Image
Image
Image
Image
Ōtāhuhu
Image
Image
Image
Image
Middlemore
Image
Image
Image
Image
Papatoetoe
Image
Image
Image
Image
Puhinui
Image
Image
Image
Image
Wiri TMD
Image
Image
Image
Image
Image
 Manukau 
Image
Homai
Image
Manurewa
Image
Te Mahia
Image
Takaanini
Image
Papakura
Image
Drury
Image
Ngākōroa
Image
Paerātā
Image
 Pukekohe 
Key
Eastern Line
Image
Image
Southern Line
Onehunga
Line
Image
Image
Western Line
multiple lines
Image
Image
under construction or
no passenger service

Transdev operated services on the following lines from Britomart (effective 12 March 2017):[7]

Rolling stock

[edit]

At conclusion

[edit]

Transdev operated the following rolling stock:

  • 72 AM three-car EMUs (built by CAF) running on all lines since full electrification in July 2015 (except Papakura - Pukekohe shuttle)
  • 8 ADL/ADC two-car DMUs (ex Transperth) owned by Auckland Transport

The AM class wear the Auckland Transport livery, and the ADL class wear the MAXX livery.

Former

[edit]

Transdev operated the following rolling stock until full electrification in July 2015:

  • 20 DC locomotives owned by KiwiRail, operating in push-pull mode with 20 sets of three or four SA cars and an SD driving car with driving cab and remote controls (ex British Rail Mark 2 carriages rebuilt for suburban service), owned by Auckland Transport. The carriages are stored at Taumarunui and the locomotives have returned to KiwiRail.[9]
  • 4 DFT/DFB locomotives owned by KiwiRail, operating in push-pull mode with six-car sets (five SA, one SD), now back with KiwiRail
  • 9 ADK/ADB two-car DMUs, in storage

All diesel rolling stock and locomotive-hauled carriage stock is in MAXX Blue livery, except four locomotives which were in KiwiRail livery.

References

[edit]
  1. "PT Reaches 100 Million". 7 June 2019. Archived from the original on 30 January 2020. Retrieved 11 June 2019.
  2. "An extra million on the trains in just three months" (Press release). Auckland Transport. 6 April 2017. Archived from the original on 16 April 2017. Retrieved 6 April 2017.
  3. "Wellingtons trains to be run by French company Transdev after KiwiRail loses contract". The Dominion Post. 17 December 2015. Archived from the original on 17 December 2015. Retrieved 21 January 2016.
  4. New operator appointed to run Auckland Transport's suburban rail service Radio New Zealand 27 August 2021
  5. ComfortDelGro JV wins contract to operate rail services in Auckland Business Times 27 August 2021
  6. ComfortDelGro joint venture lands $1.13 billion deal to operate rail services in Auckland Straits Times 27 August 2021
  7. "Train timetable changes from Sunday 12 March". Auckland Transport. 12 March 2017. Archived from the original on 12 March 2017. Retrieved 12 March 2017.
  8. "Westfield Station closing permanently from 12 March 2017". Auckland Transport. 14 March 2017. Archived from the original on 13 March 2017. Retrieved 12 March 2017.
  9. "Ticket to Ride" e.nz magazine, July/August 2007 Volume 8/4, pages 24-28
[edit]